Time Study on Winding of Bobbin for Automotive Relays in Assembly Line
Author(s):
Sajeeb Rahiman A H , MITS, VARIKOLI, KERALA, INDIA; Vinay VN, MITS; Arun Kappen, MITS; Alvin Thariyath, MITS; Mathew Prins Korah, MITS
Keywords:
Motion and Time Study Analysis, Productivity Improvement, Outline Process Chart and Flow Chart, Standard Time, Winding of Bobbin
Abstract:
The aim of the study is to propose a new method for winding of bobbin for automotive relays in the assembly line so as to increase productivity. The paper includes discussion of motion and time study implementation and its influence towards productivity improvement. The existing method is broken down into elements and analyzed in detail with the outline process chart and flow chart. The standard time is established with the time study procedures. A new method is suggested for the process. The proposed method and original method is compared with process flow chart. The better standard time for the proposed method is established with the time study which increases the annual productivity by 6.7%.
Other Details:
Manuscript Id | : | IJSTEV3I7034
|
Published in | : | Volume : 3, Issue : 7
|
Publication Date | : | 01/02/2017
|
Page(s) | : | 47-51
|
Download Article